MANUFACTURING

   


   
 

INDUR GREEN POWER PVT LTD 


Himalayan Rivers are everlasting hydel energy mines of the country with their perennial water flows, steep gradients and flooding in summer with snow-melt offering viable projects for hydel power generation with round the year water discharges, high heads, maximum generation during power staved summer months, and safe and stable underground water conductor system. Enterprising Developers from all over the country and even from other countries in the world are vying with each other for allotment of such projects in Himachal Pradesh. They are found traversing through thick forests and hilly paths for surveying the power potentials of the River sites and bidding for projects unmindful of quantum of upfront premiums against five figure turnovers and profits and excellent technical and development strengths of rivals.

M/s NSL Power Limited has successfully bagged the Tidong, Tangnu Romai and Masli Power projects and is vying for some more Projects:-



100 MW (2 x 50 MW) Tidong – I Hydro Electric Project


9 Location : Morang Tehsil, Kinnaur District, Himachal Pradesh
5 Capacity of HEP : 100 MW
9 Net Head : 595 m
4 Design Discharge : 19.20 Cumecs
8 Name of River : Tidong River, a tributary of Sutlej River
3 Turbine : Vertical Shaft Pelton Wheel
7 Tunnel Length and Diameter : 8461 m and 3.5 m D shaped
2 Energy Content : 414.15 Million Units
6 Plant Load Factor : 47.28%
1 Year of Commissioning : September 2011



 

 
   
         
       
         